Dali Urban Installation with Crane

The Dali Urban installation showed in this case took place in 2011 at the harbour area of Mörbylånga (Öland, Sweden). The installation site has strong wind speeds due to its coastal location. Concrete was used for the foundation. The wood used for the Dali tower was Swedish pine. The wind turbine was a 1.75 kW machine made in Holland. The electrical connection was made professionally by a local utility provider.

Technical description of the product is available here.

  • Product(s): Dali Urban
  • Location: Öland, Sweden
  • Customer: InnoVentum (test site)
  • Project Year: 2011